Title |
UCUI_1951_AnnualReport |
Creator |
San Francisco: Utah Construction Company |
Description |
The report includes information about the company from 1947 to the fiscal year ending October 31, 1951. The document consists of past and current company projects, shareholder's information, income and gross revenue reports, a short history of the company from 1900 to 1951, a list of clients, a financial statement regarding assets, liabilities, consolidated income, and consolidated earnings, along with a company list of the board of directors, officers, and executive committee. |
Subject |
Auditors’ reports; Financial executives; Corporation reports; Financial statements; Financial statements notes; Stockholders |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1951 |
Date |
1951 |
Date Digital |
2006 |
Temporal Coverage |
1947; 1948; 1949; 1950; 1951; 1952; 1953; 1954; 1955; 1956; 1957; 1958; 1959; 1960; 1961; 1962; 1963; 1964; 1965; 1966; 1967; 1968; 1969; 1970; 1971; 1972; 1973; 1974; 1975; 1976 |
Item Size |
8.5 inch x 11 inch |
Medium |
bound book |
Item Description |
21 page paper report bound in landscape format |
Type |
Text; Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. JPG and PDF files were then created for general use. Transcripts generated by OCR (optical character recognition). |
Language |
eng |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Source |
UCC/UIC 1900-1984 MS 100 Box 4, Special Collections, Stewart Library, Weber State University |
Format |
application/pdf |
ARK |
ark:/87278/s69709rj |
Setname |
wsu_ucui_ar |
ID |
97944 |
Reference URL |
https://digital.weber.edu/ark:/87278/s69709rj |
Title |
UCUI_1951_AnnualReport - 1951_008_page14&15 |
Image Captions |
geneva steel company s integrated steel plant near provo utah this plant was originally built by a joint venture called utah pomeroy-morrison during world war ii under a contract from Columbia steel company acting for the defense plant corporation the plant is now owned by geneva steel company and secures part of its ore requirements from the utah construction company our company also has a contract for maintenance work at the plant mucking machine loading cars in diversion tunnel of lower bear river dam a rockfill dam under construction for pacific gas & electric company about forty-five miles northeast of jackson California davis dam spillway with intake structure and base of powerhouse at left this is an earth and rockfill dam about 138 feet high above stream bed with a spillway and power outlet channel through a 200 foot rock cut at the left side of the dam the powerhouse will have five 60,000 horsepower turbines and generate 225,000 kva of electric power located on Colorado river approximately seventy miles downstream from the hoover dam the ridpath hotel a thirteen-story structure in Spokane Washington with the university club located on the top floor construction was commenced in 1950 this hotel will be opened in February 1952 and will be the most modern in the inland empire |
Description |
The report includes information about the company from 1947 to the fiscal year ending October 31, 1951. The document consists of past and current company projects, shareholder's information, income and gross revenue reports, a short history of the company from 1900 to 1951, a list of clients, a financial statement regarding assets, liabilities, consolidated income, and consolidated earnings, along with a company list of the board of directors, officers, and executive committee. |
Subject |
Auditors’ reports; Financial executives; Corporation reports; Financial statements; Financial statements notes; Stockholders |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1951 |
Date |
1951 |
Temporal Coverage |
1947-1976 |
Item Size |
8.5 inch x 11 inch |
Medium |
bound book |
Type |
Text; Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. JPG and PDF files were then created for general use. Transcripts generated by OCR (optical character recognition). |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
OCR Text |
Show geneva steel company s integrated steel plant near provo utal this plant was originally built by a joint venture called uto pomeroy-rnornson during orld var ii under o contract frotv lumbia steel company acting for the defense plant corporatlo the plant is now owned by geneva steel company and secures part of its ore requirements from the utah construction compan our company also has a contract for maintenance work at the pla 14 mucking machine loading cars in diver rockfill dam under construction for pacific gas & electric company about forty-five miles northeast of jackson california davis dam spillway with intake structure and base of powerhouse at left this is an earth and rockfill dam about 138 feet high above stream bed with a spillway and power outlet channel through a 200 foot rock cut at the left side of the dam the powerhouse will have five 60,000 horsepower turbines and generate 225,000 kva of electric power located on Colorado river approximately seventy miles downstream from the hoover dam the ridpath hotel a thirteen-story structure in Spokane Washington with the university club located on the top floor construction was commenced in 1950 this hotel will be opened in February 1952 and will be the most modern in the inland empire |
Format |
application/pdf |
Setname |
wsu_ucui_ar |
ID |
98174 |
Reference URL |
https://digital.weber.edu/ark:/87278/s69709rj/98174 |