Title |
Vol2_050_December 1932- January 1933 |
Creator |
Utah Construction Company; Six Companies, Inc. |
Contributors |
Six Companies, Inc.; Wattis, E. O. |
Image Captions |
"1823 General view of progress on the High Mix concrete Plant, and Head Tower for No. 9 Cableway. December 20th, 1932. 1841 High Mix concrete plant and Head Tower for No. 9 Cableway. January Jth, 1933. 1846 Lower Portals of the Diversion Tunnels, and excavation in the river bottom, for Downstream Cofferdam and Rock Barrier. January 6 th, 1933. 1847 Excavation operations for Downstream Cofferdam. January 6th, 1933." |
Description |
In 1931, Utah joined Six Companies Inc. to raise the surety required to bid for the Boulder (Hoover) Dam contract. One of the world’s largest dams, Hoover Dam was completed in 1936 at a cost of $49 million. These scrapbooks document through photographs the construction of the dam showcasing UCC's part in its creation. |
Subject |
Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1932; 1933 |
Date |
1932; 1933 |
Date Digital |
2008 |
Item Size |
10x13.5 inch |
Medium |
Scrapbook |
Item Description |
65 page leather bound scrapbook, black pages with photos |
Spatial Coverage |
Hoover Dam, Mohave, Arizona, United States, http://sws.geonames.org/5298509, 36.01609, -114.73804 |
Type |
Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. Digital images were reformatted in Photoshop. JPG and PDF files were then created for general use. |
Language |
eng |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Source |
MS 100 Boxes 126-130 Special Collections, Stewart Library, Weber State University |
Format |
image/jpeg |
ARK |
ark:/87278/s6gdzve5 |
Setname |
wsu_ucc_hjlaw |
ID |
44356 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6gdzve5 |
Title |
Vol2_050_December 1932- January 1933 - 000_December 1932 January 1933 |
Image Captions |
"1823 General view of progress on the High Mix concrete Plant, and Head Tower for No. 9 Cableway. December 20th, 1932. 1841 High Mix concrete plant and Head Tower for No. 9 Cableway. January Jth, 1933. 1846 Lower Portals of the Diversion Tunnels, and excavation in the river bottom, for Downstream Cofferdam and Rock Barrier. January 6 th, 1933. 1847 Excavation operations for Downstream Cofferdam. January 6th, 1933." |
Subject |
Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Format |
image/jpeg |
Setname |
wsu_ucc_hjlaw |
ID |
45298 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6gdzve5/45298 |