Title |
Vol2_021_August 1932 |
Creator |
Utah Construction Company; Six Companies, Inc. |
Contributors |
Six Companies, Inc.; Wattis, E. O. |
Image Captions |
"1495 Interior of one of the diversion tunnels, showing panel of concrete lining being poured in the invert section of the tunnel. Side wall tunnel form is shown in the background. August 24th, 1932. 1479 Section of finished diversion tunnel, in which three-foot concrete lining has been poured. Gravel has been dumped on tunnel floor as a protection from damage. Arch section is coated with bituminous compound for curing concrete. August 22nd, 1932. 1497 Apparatus used in trimming the tunnels have been converted for use in drilling holes in the concrete lining for pressure grouting. August 24th, 1932. " |
Description |
In 1931, Utah joined Six Companies Inc. to raise the surety required to bid for the Boulder (Hoover) Dam contract. One of the world’s largest dams, Hoover Dam was completed in 1936 at a cost of $49 million. These scrapbooks document through photographs the construction of the dam showcasing UCC's part in its creation. |
Subject |
Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1932; 1933 |
Date |
1932; 1933 |
Date Digital |
2008 |
Item Size |
10x13.5 inch |
Medium |
Scrapbook |
Item Description |
65 page leather bound scrapbook, black pages with photos |
Spatial Coverage |
Hoover Dam, Mohave, Arizona, United States, http://sws.geonames.org/5298509, 36.01609, -114.73804 |
Type |
Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. Digital images were reformatted in Photoshop. JPG and PDF files were then created for general use. |
Language |
eng |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Source |
MS 100 Boxes 126-130 Special Collections, Stewart Library, Weber State University |
Format |
image/jpeg |
ARK |
ark:/87278/s6k0f65r |
Setname |
wsu_ucc_hjlaw |
ID |
44313 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6k0f65r |
Title |
Vol2_021_August 1932 - 000_August_1932 |
Image Captions |
"1495 Interior of one of the diversion tunnels, showing panel of concrete lining being poured in the invert section of the tunnel. Side wall tunnel form is shown in the background. August 24th, 1932. 1479 Section of finished diversion tunnel, in which three-foot concrete lining has been poured. Gravel has been dumped on tunnel floor as a protection from damage. Arch section is coated with bituminous compound for curing concrete. August 22nd, 1932. 1497 Apparatus used in trimming the tunnels have been converted for use in drilling holes in the concrete lining for pressure grouting. August 24th, 1932. " |
Subject |
Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Format |
image/jpeg |
Setname |
wsu_ucc_hjlaw |
ID |
45116 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6k0f65r/45116 |