Vol3_049_September 1934

Title Vol3_049_September 1934
Creator Utah Construction Company; Six Companies, Inc.
Contributors Six Companies, Inc.; Lawler, H. J.
Image Captions "2860 Looking downstream into the Arizona Spillway. September 27th, 1934 2861 Looking downstream into the portal of No. 4 Raise. September 27th, 1934 2865 Looking from the Arizona side, toward the Nevada side, showing all four Intake Towers, three derricks, Boulder Dam to the left, and the Nevada Spillway to the right. September 27th, 1934.
Description In 1931, Utah joined Six Companies Inc. to raise the surety required to bid for the Boulder (Hoover) Dam contract. One of the world’s largest dams, Hoover Dam was completed in 1936 at a cost of $49 million. These scrapbooks document through photographs the construction of the dam showcasing UCC's part in its creation.
Subject Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company
Digital Publisher Stewart Library, Weber State University, Ogden, Utah, USA
Date Original 1933; 1934; 1935
Date 1933; 1934; 1935
Date Digital 2008
Item Size 10x13.5 inch
Medium Scrapbook
Item Description 93 page leather bound scrapbook, black pages with photos
Spatial Coverage Hoover Dam, Mohave, Arizona, United States, http://sws.geonames.org/5298509, 36.01609, -114.73804
Type Image/StillImage
Conversion Specifications Archived TIFF images were scanned with an Epson Expression 10000XL scanner. Digital images were reformatted in Photoshop. JPG and PDF files were then created for general use.
Language eng
Relation https://archivesspace.weber.edu/repositories/3/resources/212
Rights Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University.
Source MS 100 Boxes 126-130 Special Collections, Stewart Library, Weber State University
Format image/jpeg
ARK ark:/87278/s6meg9bk
Setname wsu_ucc_hjlaw
ID 44159
Reference URL https://digital.weber.edu/ark:/87278/s6meg9bk