The report includes information about the company for the fiscal year ending October 31, 1958. This consists of a management comment to the shareholders, an abstract of operations, properties and interests, and financial statements including the auditors' report. |
Subject |
Auditors’ reports; Financial executives; Corporation reports; Financial statements; Financial statements notes; Stockholders |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1958 |
Date |
1958 |
Date Digital |
2006 |
Temporal Coverage |
1947; 1948; 1949; 1950; 1951; 1952; 1953; 1954; 1955; 1956; 1957; 1958; 1959; 1960; 1961; 1962; 1963; 1964; 1965; 1966; 1967; 1968; 1969; 1970; 1971; 1972; 1973; 1974; 1975; 1976 |
Item Size |
8.5 inch x 11 inch |
Medium |
bound book |
Item Description |
25 page paper report bound in landscape format |
Type |
Text; Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. JPG and PDF files were then created for general use. Transcripts generated by OCR (optical character recognition). |
Language |
eng |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Source |
UCC/UIC 1900-1984 MS 100 Box 4, Special Collections, Stewart Library, Weber State University |
Format |
application/pdf |
ARK |
ark:/87278/s6mkgm2m |
Setname |
wsu_ucui_ar |
ID |
97956 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6mkgm2m |
Title |
UCUI_1958_AnnualReport - 1958_005_page8&9 |
Image Captions |
using an odd but efficient combination of ancient methods and modern equipment the utah organization is pushing work on the huge karnafuli dam in Pakistan to develop a needed source of power the dam scheduled for completion in 1960 will be a great embankment 3,000 feet long and 130 feet high and is the largest power-irrigation project u s aid and contractors are putting up anywhere in the world supporting the project field organization of about 70 americans and 2500 pakistanis is a complete stateside administrative and procurement organization utahs ability to successfully undertake the tremendous logistics problems encountered on an extensive project in a remote area is exemplified by this project substantial progress was made on the vast toquepala project during the year this comprehensive mine and metallurgical processing facility is being constructed for the southern peru copper corporation substantial parts of this project are located high in the andes mountains and other portions are located at he port of ilo cia utah pacific is managing sponsor of this project which includes a concentrating mill smelter complete power generation and power transmission facilities seaport installations highways tunnels and bridges a standard gauge railroad and railroad equipment water supply system including pipelines canals and reservoirs shops and warehouses and town sites for both mine and mill areas completion is scheduled for april 1960 the picture shows the huge concentrator facility construction at about 9,000 feet elevation in the andes mountains construction operations continued on the mammoth serre-poncon dam on the durance river near gap france featuring an extensive subsurface grout curtain this 20 million cubic yard earthfill dam will be completed in 1959 approximately a year ahead of schedule this multipurpose dam is being constructed by an international joint venture with utah construction company furnishing an American project manager project engineer and an additional supporting staff |
Description |
The report includes information about the company for the fiscal year ending October 31, 1958. This consists of a management comment to the shareholders, an abstract of operations, properties and interests, and financial statements including the auditors' report. |
Subject |
Auditors' Report;Directors and Officers;Financial Highlights;Financial Statements;Management Comment;Operations;Properties and Interests;Shareholders |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1958 |
Date |
1958 |
Temporal Coverage |
1947-1976 |
Item Size |
8.5 inch x 11 inch |
Medium |
bound book |
Type |
Text; Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. JPG and PDF files were then created for general use. Transcripts generated by OCR (optical character recognition). |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
OCR Text |
Show substantial progress was mad the year this comprehensie n...c u»u « fcility is being constructed for the southern ion substantial pa f hi j l f p f this projec mountains and other por utah pacific is managing sponsor of this project trating mill smelter complete power gen ission facilities seaport installations high bridges a standard gauge railroad and railroad |