Title |
UCUI_1957_AnnualReport |
Creator |
San Francisco: Utah Construction Company |
Description |
The report includes information about the company for the fiscal year ending October 31, 1957. This consists of a management comment to the shareholders, an abstract of operations, properties and interests, and financial statements including the auditors' report. |
Subject |
Auditors’ reports; Financial executives; Corporation reports; Financial statements; Financial statements notes; Stockholders |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1957 |
Date |
1957 |
Date Digital |
2006 |
Temporal Coverage |
1947; 1948; 1949; 1950; 1951; 1952; 1953; 1954; 1955; 1956; 1957; 1958; 1959; 1960; 1961; 1962; 1963; 1964; 1965; 1966; 1967; 1968; 1969; 1970; 1971; 1972; 1973; 1974; 1975; 1976 |
Item Size |
8.5 inch x 11 inch |
Medium |
bound book |
Item Description |
31 page paper report bound in landscape format |
Type |
Text; Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. JPG and PDF files were then created for general use. Transcripts generated by OCR (optical character recognition). |
Language |
eng |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Source |
UCC/UIC 1900-1984 MS 100 Box 4, Special Collections, Stewart Library, Weber State University |
Format |
application/pdf |
ARK |
ark:/87278/s6sgbjvb |
Setname |
wsu_ucui_ar |
ID |
97955 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6sgbjvb |
Title |
UCUI_1957_AnnualReport - 1957_006_page10&11 |
Image Captions |
twenty six miles up the feather river canyon north of Oroville California utah construction company is 60 percent sponsor of a joint venture driving a seven mile river diversion tunnel through the mountains to a new powerhouse under contract with pacific gas & electric company in connection with its 35 million poe power hydroelectric project for many years industrial owners of large mine properties have engaged utah construction company to perform their contract strip mining of coal iron ore and variety of non-ferrous metals here a utah drilling rig is shown operating near garrison Montana under a contract with Montana phosphate products company involving stripping mining and hauling of phosphate rock for the past three years utah construction company has been participating in joint venture with other major u s contractors on four st Lawrence seaway contracts for the n y power authority and corps of engineers totaling over 100 million grass river lock Massena intake structure long sault dam and barnhart island powerhouse pictured here is a view of the 25 million grass river lock project looking downstream across the upper sill completion scheduled within several months will be nearly two years ahead of original contract scheduling |
Description |
The report includes information about the company for the fiscal year ending October 31, 1957. This consists of a management comment to the shareholders, an abstract of operations, properties and interests, and financial statements including the auditors' report. |
Subject |
Auditors' Report;Directors and Officers;Financial Highlights;Financial Statements;Management Comment;Operations;Properties and Interests;Shareholders |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1957 |
Date |
1957 |
Temporal Coverage |
1947-1976 |
Item Size |
8.5 inch x 11 inch |
Medium |
bound book |
Type |
Text; Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. JPG and PDF files were then created for general use. Transcripts generated by OCR (optical character recognition). |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
OCR Text |
Show twenty-six miles up the feather river canyon california utqh construction company is 60 pe the mountains to a new powerhouse under contract gas & electric company in connection with its 35 power hydroelectric project th of ore it spons nel through for many years industrial owners of large mine properties have engaged utah conduction com pany to perform their contract strip mining of coal iron ore q no o variety ot non-rerrous meto is here a utah drilling rig is shown operating near garrison montana under a contract with montana phosphate products company involving stripping mining and hauling of phosphate rock for the past three years utah construction company hos been participating in joint venture with other mo|0r u.s contractors on four st lawrence seaway contracts for the n y power authority and corps of engineers totaling over 100 million — grass river lock massena intake structure long sault dam and barnhart island powerhouse pictured here is a view of the 25 million grass river lock project looking downstream across the upper sill completion scheduled within several months will be nearly two years ahead of original |
Format |
application/pdf |
Setname |
wsu_ucui_ar |
ID |
98344 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6sgbjvb/98344 |