Title |
Vol3_079_May- June 1935 |
Creator |
Utah Construction Company; Six Companies, Inc. |
Contributors |
Six Companies, Inc.; Lawler, H. J. |
Image Captions |
"3269 Boulder Dam, looking downstream from the Arizona side. May 27th, 1935. 3296 Boulder Dam, looking downstream from the Nevada side, showing Spillways and the Intake Towers. June 1st, 1935. 3284 Looking in a general downstream direction, on the Arizona Black Canyon Highway, showing Six Companies Inc. road work. May 27th, 1935. 3303 View of the open cut portion of the Switchyard Control Circuit Tunnel. Shovel is excavating for the Switchyard, and the building in the foreground is the power sub-station. The Babcock and Wilcox Company plant can be seen in the extreme background June 1st, 1935" |
Description |
In 1931, Utah joined Six Companies Inc. to raise the surety required to bid for the Boulder (Hoover) Dam contract. One of the world’s largest dams, Hoover Dam was completed in 1936 at a cost of $49 million. These scrapbooks document through photographs the construction of the dam showcasing UCC's part in its creation. |
Subject |
Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1933; 1934; 1935 |
Date |
1933; 1934; 1935 |
Date Digital |
2008 |
Item Size |
10x13.5 inch |
Medium |
Scrapbook |
Item Description |
93 page leather bound scrapbook, black pages with photos |
Spatial Coverage |
Hoover Dam, Mohave, Arizona, United States, http://sws.geonames.org/5298509, 36.01609, -114.73804 |
Type |
Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. Digital images were reformatted in Photoshop. JPG and PDF files were then created for general use. |
Language |
eng |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Source |
MS 100 Boxes 126-130 Special Collections, Stewart Library, Weber State University |
Format |
image/jpeg |
ARK |
ark:/87278/s6x6kknp |
Setname |
wsu_ucc_hjlaw |
ID |
44198 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6x6kknp |
Title |
Vol3_079_May- June 1935 - 004_Switchyard Control Circuit Tunnel |
Image Captions |
3303 View of the open cut portion of the Switchyard Control Circuit Tunnel. Shovel is excavating for the Switchyard, and the building in the foreground is the power sub-station. The Babcock and Wilcox Company plant can be seen in the extreme background June 1st, 1935 |
Subject |
Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Format |
image/jpeg |
Setname |
wsu_ucc_hjlaw |
ID |
44569 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6x6kknp/44569 |