"1378 Fabricated steel forms for placing the 3-foot thick lining in the side wall section of the diversion tunnels being erected outside the upper portal of Diversion Tunnel No. 1. July 23rd, 1932. 1381 Apparatus devised for drilling grout holes through the concrete lining of the diversion tunnels. Air drills are mounted on bars. The grouting jumbo travels on rails laid on the invert floor. July 23rd, 1932. 1314 Workmen at isolated points away from drinking fountains are supplied by desert water bags. The picture shows a crew of "water boys" at the Arizona spillway. July 14, 1932 1315 Jackhamer men working on the floor of the Arizona spillway open-cut excavation. Workman in foreground is blowing dust from Jackhamer hole. July 14th, 1932" |
Description |
In 1931, Utah joined Six Companies Inc. to raise the surety required to bid for the Boulder (Hoover) Dam contract. One of the world’s largest dams, Hoover Dam was completed in 1936 at a cost of $49 million. These scrapbooks document through photographs the construction of the dam showcasing UCC's part in its creation. |
Subject |
Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1932; 1933 |
Date |
1932; 1933 |
Date Digital |
2008 |
Item Size |
10x13.5 inch |
Medium |
Scrapbook |
Item Description |
65 page leather bound scrapbook, black pages with photos |
Spatial Coverage |
Hoover Dam, Mohave, Arizona, United States, http://sws.geonames.org/5298509, 36.01609, -114.73804 |
Type |
Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. Digital images were reformatted in Photoshop. JPG and PDF files were then created for general use. |
Language |
eng |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Source |
MS 100 Boxes 126-130 Special Collections, Stewart Library, Weber State University |
Format |
image/jpeg |
ARK |
ark:/87278/s6xwyj51 |
Setname |
wsu_ucc_hjlaw |
ID |
44303 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6xwyj51 |
Title |
Vol2_011_July 1932 - 000_July 1932 |
Image Captions |
"1378 Fabricated steel forms for placing the 3-foot thick lining in the side wall section of the diversion tunnels being erected outside the upper portal of Diversion Tunnel No. 1. July 23rd, 1932. 1381 Apparatus devised for drilling grout holes through the concrete lining of the diversion tunnels. Air drills are mounted on bars. The grouting jumbo travels on rails laid on the invert floor. July 23rd, 1932. 1314 Workmen at isolated points away from drinking fountains are supplied by desert water bags. The picture shows a crew of "water boys" at the Arizona spillway. July 14, 1932 1315 Jackhamer men working on the floor of the Arizona spillway open-cut excavation. Workman in foreground is blowing dust from Jackhamer hole. July 14th, 1932" |
Subject |
Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Format |
image/jpeg |
Setname |
wsu_ucc_hjlaw |
ID |
45069 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6xwyj51/45069 |