OCR Text |
Show Work in Progress - 1942 % Joint Contracts 30 Davis Dam $18, 996,392.00 20 Norfork Dam 10,778,726.00 10 Delaware Aqueduct - Contract 308 11,971,835. 00 1-1/4 Corpus Christi Airport 23,318,000.00 10 Washington North Jetty 1,720,354.00 10 Pearl Harbor Dry Docks #2, 3, 4 22,070,000.00 10 Los Angeles - Long Beach Breakwater 10,321,300.00 10 San Diego Dry Docks 4, 750,000.00 10 Shasta Gravel Contract 7,304,000.00 6.3 Pacific Naval Air Bases 256,000,000.00 10 Alameda Floating Dry Docks 5,615,534.00 33-1/3 Provo Steel Plant 29,735,000.00 10 Mare Island Shore Facilities 9,991,456.00 10 Mare Island Shipbuilding Facility 7,768,998.00 10 Coaster Vessels - Pacific Bridge Co. 8,550,000.00 6.3 Port Hueneme 50,000,000.00 20 Norfork Dam Power House 1,029,080.00 10 Alameda Shipbuilding Yard 83,000,000.00 #2 NOy 5464 Utah Construction Company Work Duchesne Tunnel 797,769.00 Utah Copper Company work 2,495,545.96 Union Pacific Railroad Co. work 115,000.00 Watauga Tunnel 1, 890,597.00 Utah Copper Co. - Christensen Const. Co. 780,000.00 U.S. Engineers - St. John, Utah 349,534.00 Chemical Constructors 175,000.00 Affiliated Companies Associated Contractors Inc. 21,333,333.00 California Shipbuilding Corp. 413,876,680.00 Consolidated Builders, Inc. 41,000,000.00 Joshua Hendy Iron Works 45,508,360.00 Oregon Shipbuilding Corp. 174,955,000.00 Permanente Corporation 22,500,000.00 Permanente Metals Corp. |