OCR Text |
Show NAME AND BRIEF DESCRIPTION OF PROJECT LOCATION OWNER (Name and Address) ESTIMATED CONSTR. COST P or S TYPES OF SERVICES (Use Symbols from 16A) Started (Actual or Estimated Mo/Yr) Estimated Profess'l Man-Months 7. Zinc Oxide Fuming Plants-electrolytic Corpus Christi, Texas American Smelting and Refining 4,205,000 P C, D l951 1955 1953 1958 50 7, Zinc Oxide Fuming Plant California American Smelting and Refining 1,777,000 P C, D 1953 1954 50 7. Zinc Oxide Fuming Plant Chihuahua, Mexico American Smelting and Refining 1,433,000 P C,D 1950 1952 65 7. Zinc Oxide Fuming Plant Rosita, Mexico American Smelting and Refining 5,000,000 P C,D 1952 1953 75 7. Electrolytic Copper Refinery wner furnished process design, utah served as engineer and contractor designing the buildings and managing construction. Garfield, Utah Kennecott Copper Corp. 17,000,000 P B, C, D, G 1947 1949 250 2. Mineral Resources Survey Ferrous Non-ferrous mineral resources Exa, Republic of Korea-International Cooperation Administration Project Republic of Korea Geological Survey, Seoul, Korea P H, I, M 12/58 7/60 20 6, 30, 62, 83, Navajo Mine .rip coal mining, crushing, stockpiling New Mexico Utah Construction & Mining Co. 8,000,000 P B, C, D, F, G, H, I, K, D, M, P 7/54 - 200 30, 62. Cedar City Contact Mining-iron ore stripping mining Cedar City, Utah Colorado Fuel & Iron Pueblo, Colo, 3,000,000 P C, D, G, H, U, M, P 5/43 - 150 TOTAL NUMBER OF CONTRACTS A. UNDERWAY P. COMPLETE TOTAL ESTIMATED CONSTRUCTION COST OF PROJECTS FOR WHICH A/T WORK IS: A. UNDERWAY 14,000,000 B. COMPLETED 197,036,000 |