Title |
Vol3_059_December 1934- January 1935 |
Creator |
Utah Construction Company; Six Companies, Inc. |
Contributors |
Six Companies, Inc.; Lawler, H. J. |
Image Captions |
"2963 No. 5 Intake Tower finished to Elevation 1232, showing curtain wall. December 5th, 1934 2980 Looking upstream at the upper end of No. 1 Plug, showing forms for the Intake Transition. December 19th, 1934. 3009 Telephoto looking downstream into the Arizona Spillway, showing construction of the spillway bridge. January 8th, 1935 2977 Looking upstream into No. 1 Plug, showing the placing of the high pressure valves and method of pouring. December 19th, 1934" |
Description |
In 1931, Utah joined Six Companies Inc. to raise the surety required to bid for the Boulder (Hoover) Dam contract. One of the world’s largest dams, Hoover Dam was completed in 1936 at a cost of $49 million. These scrapbooks document through photographs the construction of the dam showcasing UCC's part in its creation. |
Subject |
Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1933; 1934; 1935 |
Date |
1933; 1934; 1935 |
Date Digital |
2008 |
Item Size |
10x13.5 inch |
Medium |
Scrapbook |
Item Description |
93 page leather bound scrapbook, black pages with photos |
Spatial Coverage |
Hoover Dam, Mohave, Arizona, United States, http://sws.geonames.org/5298509, 36.01609, -114.73804 |
Type |
Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. Digital images were reformatted in Photoshop. JPG and PDF files were then created for general use. |
Language |
eng |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Source |
MS 100 Boxes 126-130 Special Collections, Stewart Library, Weber State University |
Format |
image/jpeg |
ARK |
ark:/87278/s6p72pm4 |
Setname |
wsu_ucc_hjlaw |
ID |
44201 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6p72pm4 |
Title |
Vol3_059_December 1934- January 1935 - 000_December 1934- January 1935 |
Image Captions |
"2963 No. 5 Intake Tower finished to Elevation 1232, showing curtain wall. December 5th, 1934 2980 Looking upstream at the upper end of No. 1 Plug, showing forms for the Intake Transition. December 19th, 1934. 3009 Telephoto looking downstream into the Arizona Spillway, showing construction of the spillway bridge. January 8th, 1935 2977 Looking upstream into No. 1 Plug, showing the placing of the high pressure valves and method of pouring. December 19th, 1934" |
Subject |
Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Format |
image/jpeg |
Setname |
wsu_ucc_hjlaw |
ID |
44578 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6p72pm4/44578 |