Title |
Vol2_020_July-August 1932 |
Creator |
Utah Construction Company; Six Companies, Inc. |
Contributors |
Six Companies, Inc.; Wattis, E. O. |
Image Captions |
"1413-1414 These pictures, together with the two on the opposite page, complete the panorama of the canyon rim operations on the Nevada side of the river. In the picture to the left is shown the open cut excavation for the Nevada spillway. Above the spillway excavation is the start of the fill for the cableway bench. At the right is shown trucks hauling excavated rock to the Nevada spoil dumps. August 12th, 1932. 1394 This picture was taken at the Nevada abutment of the Dam. Workmen are drilling for the extension of the highway from the damsite to the Nevada spillway. The boom of a shovel is shown working in from the opposite direction. July 26th 1932 1397 Close-up view of Jackhamer men drilling for the extension of Black Canyon highway from the Dam to the Nevada spillway.July 26th, 1932." |
Description |
In 1931, Utah joined Six Companies Inc. to raise the surety required to bid for the Boulder (Hoover) Dam contract. One of the world’s largest dams, Hoover Dam was completed in 1936 at a cost of $49 million. These scrapbooks document through photographs the construction of the dam showcasing UCC's part in its creation. |
Subject |
Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1932; 1933 |
Date |
1932; 1933 |
Date Digital |
2008 |
Item Size |
10x13.5 inch |
Medium |
Scrapbook |
Item Description |
65 page leather bound scrapbook, black pages with photos |
Spatial Coverage |
Hoover Dam, Mohave, Arizona, United States, http://sws.geonames.org/5298509, 36.01609, -114.73804 |
Type |
Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. Digital images were reformatted in Photoshop. JPG and PDF files were then created for general use. |
Language |
eng |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Source |
MS 100 Boxes 126-130 Special Collections, Stewart Library, Weber State University |
Format |
image/jpeg |
ARK |
ark:/87278/s65kh9z4 |
Setname |
wsu_ucc_hjlaw |
ID |
44333 |
Reference URL |
https://digital.weber.edu/ark:/87278/s65kh9z4 |
Title |
Vol2_020_July-August 1932 - 001_Canyon Rim Operations |
Image Captions |
1413-1414 These pictures, together with the two on the opposite page, complete the panorama of the canyon rim operations on the Nevada side of the river. In the picture to the left is shown the open cut excavation for the Nevada spillway. Above the spillway excavation is the start of the fill for the cableway bench. At the right is shown trucks hauling excavated rock to the Nevada spoil dumps. August 12th, 1932. |
Subject |
Boulder City (Nev.); Dams--Design and construction; Hoover Dam (Ariz. And Nev.); Six Companies, Inc; Utah Construction Company |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Format |
image/jpeg |
Setname |
wsu_ucc_hjlaw |
ID |
45204 |
Reference URL |
https://digital.weber.edu/ark:/87278/s65kh9z4/45204 |