Title |
UCUI_1953_AnnualReport |
Creator |
San Francisco: Utah Construction Company |
Description |
The report includes information about the company for the fiscal year ending October 31, 1953. This consists of a management comment to the shareholders, an abstract of operations, properties and interests, and financial statements including the auditors' report. |
Subject |
Auditors’ reports; Financial executives; Corporation reports; Financial statements; Financial statements notes; Stockholders |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1953 |
Date |
1953 |
Date Digital |
2006 |
Temporal Coverage |
1947; 1948; 1949; 1950; 1951; 1952; 1953; 1954; 1955; 1956; 1957; 1958; 1959; 1960; 1961; 1962; 1963; 1964; 1965; 1966; 1967; 1968; 1969; 1970; 1971; 1972; 1973; 1974; 1975; 1976 |
Item Size |
8.5 inch x 11 inch |
Medium |
bound book |
Item Description |
25 page paper report bound in landscape format |
Type |
Text; Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. JPG and PDF files were then created for general use. Transcripts generated by OCR (optical character recognition). |
Language |
eng |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Source |
UCC/UIC 1900-1984 MS 100 Box 4, Special Collections, Stewart Library, Weber State University |
Format |
application/pdf |
ARK |
ark:/87278/s6cqbgtc |
Setname |
wsu_ucui_ar |
ID |
97946 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6cqbgtc |
Title |
UCUI_1953_AnnualReport - 1953_012_page22&23 |
Image Captions |
construction records broken with the establishment of the beachhead an efficient team of u s technicians supplemented by a fast expanding army of local peruvians moved rapidly with a common goal ore must move by may the result was a record for accelerated construction never before seen in this part of the world these men were dedicated to proving that sometimes the impossible can be accomplished even sooner steel fingers emerged from the water soon to provide support for a reinforced concrete ship loading dock expending 1,000 feet into the bay of san juan at both the mine and the port steel towers and conveyors were erected to provide for efficient handling of the millions of tons of iron ore to come from the large deposits at marcona the 17 mile road providing the vital link between the mine and port was graded and surfaced to accommodate the specially designed 60 ton ore hauling trucks a crusher was installed at the mine to reduce the ore to proper size for feeding to u s blast furnaces this installation is one of the largest of its type in the world today stockpiling and screening equipment were erected at both the mine and the port |
Description |
The report includes information about the company for the fiscal year ending October 31, 1953. This consists of a management comment to the shareholders, an abstract of operations, properties and interests, and financial statements including the auditors' report. |
Subject |
Auditors’ reports; Financial executives; Corporation reports; Financial statements; Financial statements notes; Stockholders |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1953 |
Date |
1953 |
Temporal Coverage |
1947-1976 |
Item Size |
8.5 inch x 11 inch |
Medium |
bound book |
Type |
Text; Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. JPG and PDF files were then created for general use. Transcripts generated by OCR (optical character recognition). |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
OCR Text |
Show the 17 mile road providing the vital link between the mine and port was graded and surfaced to accommo date the specially designed 60 ton ore hauling trucks a crusher was installed at the mine to reduce the ore to proper size for feeding to u s blast furnaces this installation is one of the largest of its type in the world today stockpiling and screening equipment were erected at both the mine and the port construction records broken with the establishment of the beachhead an efficient team of u s technicians supplemented by a fast ex panding army of local peruvians moved rapidly with a common goal — ore must move by may the result was a record for accelerated construction never before seen in this part of the world these men were dedi cated to proving that sometimes the impossible can be accomplished even sooner steel fingers emerged from the water soon to provide support for a reinforced concrete shiploading dock ex tending 1,000 feet into the bay of san juan at both the mine and the port steel towers and con veyors were erected to provide for efficient handlinj of the millions of tons of iron ore to come from the large deposits at marcona 23 |
Format |
application/pdf |
Setname |
wsu_ucui_ar |
ID |
98203 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6cqbgtc/98203 |