Title |
UCUI_1955_AnnualReport |
Creator |
San Francisco: Utah Construction Company |
Description |
The report includes information about the company for the fiscal year ending October 31, 1955. This consists of a management comment to the shareholders, an abstract of operations, properties and interests, and financial statements including the auditors' report. |
Subject |
Auditors’ reports; Financial executives; Corporation reports; Financial statements; Financial statements notes; Stockholders |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1955 |
Date |
1955 |
Date Digital |
2006 |
Temporal Coverage |
1947; 1948; 1949; 1950; 1951; 1952; 1953; 1954; 1955; 1956; 1957; 1958; 1959; 1960; 1961; 1962; 1963; 1964; 1965; 1966; 1967; 1968; 1969; 1970; 1971; 1972; 1973; 1974; 1975; 1976 |
Item Size |
8.5 inch x 11 inch |
Medium |
bound book |
Item Description |
21 page paper report bound in landscape format |
Type |
Text; Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. JPG and PDF files were then created for general use. Transcripts generated by OCR (optical character recognition). |
Language |
eng |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Source |
UCC/UIC 1900-1984 MS 100 Box 4, Special Collections, Stewart Library, Weber State University |
Format |
application/pdf |
ARK |
ark:/87278/s6nw3tch |
Setname |
wsu_ucui_ar |
ID |
97953 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6nw3tch |
Title |
UCUI_1955_AnnualReport - 1955_003_page4&5 |
Image Captions |
left above flotation process equipment installed in the concentrator building of san manuel copper corporation plant san manuel arizona the entire facilities were designed engineered and constructed at a cost of $59,000,000 by a joint venture of utah construction company as sponsor and stearns-roger manufacturing company the project will be completed ahead of schedule and considerably under the original cost estimates left above ore handling hoists constructed for san manuel copper corporation at nearby red hill mine right above grinding bay of concentrator building showing rod mills at the left and ball mills at the right far right an aerial view of the entire plant and a portion of the 37 miles of rail servicing facilities and trestles constructed for san manuel copper corporation showing the concentrator building to the left and the smelter at the upper right the fumes stack is 500 feet high and 20 feet in diameter below construction in progress near salt lake city of the earth filled wanship dam and spillway for a reservoir and water conservation purposes being performed by utah construction company for u s bureau of reclamation at a contract price of $2,600,000 heavy equipment employed in initial phases of construction of a power house on barnhardt island in the st lawrence river for the n y power authority utah construction company is a participant in this $26,000,000 joint venture of utah walsh morrison-knudsen kiewit perini & son the installation is a segment of the vast st lawrence seaway project left pouring concrete in construction of table rock dam on the arkansas missouri border for the u s corps of engineers flood control project this is $24,387,000 project being performed by a joint venture in which utah construction company is a participant and will be completed in 1958 |
Description |
The report includes information about the company for the fiscal year ending October 31, 1955. This consists of a management comment to the shareholders, an abstract of operations, properties and interests, and financial statements including the auditors' report. |
Subject |
Auditors’ reports; Financial executives; Corporation reports; Financial statements; Financial statements notes; Stockholders |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1955 |
Date |
1955 |
Temporal Coverage |
1947-1976 |
Item Size |
8.5 inch x 11 inch |
Medium |
bound book |
Type |
Text; Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. JPG and PDF files were then created for general use. Transcripts generated by OCR (optical character recognition). |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
OCR Text |
Show profits on new work were very small in 1955 dividends paid in 1955 ex ceeded earnings for that year so that these companies caused us to report a decrease in our share of the undistributed profits of subsidiary and affiliated companies the declining trend in our backlog of work was reversed at the end of the first quarter of 1955 and thereafter the company enjoyed unusual success in obtaining new work the company ended the year with the highest backlog of uncompleted construction work in its history the mere size of the work backlog is not necessarily a measure of the profits it may produce for it can be inflated by the inclusion of contracts of the type which produce large gross revenues but small gross profits such as cost-plus-fixed-fee contracts for military or atomic energy commission installations building contracts also tend to carry lower profit margins in relation to gross revenues than do heavy engineering contracts where the risk is commensurately greater your management feels that our portfolio of construction contracts on hand at the end of the year is well balanced both from the standpoint of the types of risks involved and the periods of time during which the work must be performed it includes a substantial proportion of long-term contracts as well as short-term contracts and is diversified by types of work and by the countries in which the work must be performed we are hopeful that it will produce over the next several years profits commen surate with its size left above floto n process equipment installed in inuel copper corporation plant f 59,000,000 by a joint ventur below construction in progress near salt lake city of earth filled wanship dam and spillway for a reservoif and water conservation purposes being performed by utah construction company for u s bureau of reclamation at a contract price of 2,600,000 heavy equipment employed in initial phases of construction of a power house on barnhardt island in the st lawrence river for the n y power authority utah construction company is a participant ii this 36,000,000 joint venture of utah walsh morrison-knudsen kiewit perini & son this installation is a segment af the vast st lawrence seaway project left pouring concrete in construction of table rock dam on the arkansas missouri border for the u s corps of engineers a 24 387 000 project being performed by a joint venture n wh ch utah con t uct on company is a pa t c pant and will be completed n 1958 |
Format |
application/pdf |
Setname |
wsu_ucui_ar |
ID |
98318 |
Reference URL |
https://digital.weber.edu/ark:/87278/s6nw3tch/98318 |