Title |
UCUI_1959_AnnualReport |
Creator |
San Francisco: Utah Construction & Mining Co. |
Description |
The report includes information about the company for the fiscal year ending October 31, 1959. This consists of a management comment to the shareholders, an abstract of operations, properties and interests, and financial statements including the auditors' report. |
Subject |
Auditors’ reports; Financial executives; Corporation reports; Financial statements; Financial statements notes; Stockholders |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1959 |
Date |
1959 |
Date Digital |
2006 |
Temporal Coverage |
1947; 1948; 1949; 1950; 1951; 1952; 1953; 1954; 1955; 1956; 1957; 1958; 1959; 1960; 1961; 1962; 1963; 1964; 1965; 1966; 1967; 1968; 1969; 1970; 1971; 1972; 1973; 1974; 1975; 1976 |
Item Size |
8.5 inch x 11 inch |
Medium |
bound book |
Item Description |
23 page paper report bound in landscape format |
Type |
Text; Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. JPG and PDF files were then created for general use. Transcripts generated by OCR (optical character recognition). |
Language |
eng |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
Source |
UCC/UIC 1900-1984 MS 100 Box 4, Special Collections, Stewart Library, Weber State University |
Format |
application/pdf |
ARK |
ark:/87278/s693q6ft |
Setname |
wsu_ucui_ar |
ID |
97958 |
Reference URL |
https://digital.weber.edu/ark:/87278/s693q6ft |
Title |
UCUI_1959_AnnualReport - 1959_006_page10&11 |
Image Captions |
in melbourne australia our subsidiary utah australia limited is erecting a two-level one-mile structure over the yarra river known as the king street bridge this project immediate left when completed will east traffic congestion at one of melbournes busiest intersections shown here is a steel reinforcing cage being lowered into one of a series of 5-foot diameter caissons some of which were driven as much as 200 feet below the surface of the river on the san pedro river near quito ecuador utah international inc is constructing under contract with empresa electrica quito s a a $6,000,000 hydroelectric project which includes a diversion dam tunnel and 40,000 kw powerhouse pictured at the extreme left is the tunnel-driving operation in the 5 ½-mile tunnel with an 11 ½-foot inside diameter at the left is shown excavation operations in one of two 37-foot diameter diversion tunnels in connection with bumiphol dam and power plant 400 miles northwest of bangkok thailand this job a $23,000,000 portion of the yanhee power and irrigation project is being performed by a joint venture in which utah international is a 40% partner at the right is shown a comprehensive aerial view of a major portion of the $200,000,000 southern peru copper corporation installation constructed by our subsidiary cia utah pacific ltd this project situated in the andes mountains in peru encompassed constr4uction of a completely integrated multi-pant copper mine ineral processing facilities and port work at ilo peru also included were two town sites a railroad and highway between port and plant 45,000 kw power plant and water storage facilities the project was completed in 1959 eight months ahead of schedule |
Description |
The report includes information about the company for the fiscal year ending October 31, 1959. This consists of a management comment to the shareholders, an abstract of operations, properties and interests, and financial statements including the auditors' report. |
Subject |
Auditors' Report;Directors and Officers;Financial Highlights;Financial Statements;Management Comment;Operations;Properties and Interests;Shareholders |
Digital Publisher |
Stewart Library, Weber State University, Ogden, Utah, USA |
Date Original |
1959 |
Date |
1959 |
Temporal Coverage |
1947-1976 |
Item Size |
8.5 inch x 11 inch |
Medium |
bound book |
Type |
Text; Image/StillImage |
Conversion Specifications |
Archived TIFF images were scanned with an Epson Expression 10000XL scanner. JPG and PDF files were then created for general use. Transcripts generated by OCR (optical character recognition). |
Relation |
https://archivesspace.weber.edu/repositories/3/resources/212 |
Rights |
Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University. |
OCR Text |
Show in melbourne australia our subsidiary utah aus tralia limited is erecting a two~level one^mile struc ture over the yarra river known as the king street bridge this project immediate left when com pleted will ease traffic congestion at one of mel bourne's busiest intersections shown here is a steel reinforcing cage being lowered into one of a series of 5-foot diameter caissons some of which were driven as much as 200 feet below the surface of the river on the san pedro river near quito ecuador utah international inc is constructing under contract with empresa electrica quito s a a 6,000,000 hydroelectric project which includes a diversion dam tunnel and 40,000 kw powerhouse pictured at the extreme left is the tunnel-driving operation in the 5y2-mile tunnel with an lli/z-foot inside diameter at the left is shown excavation operations in one of two 37-foot diameter diversion tunnels in connection with bumiphol dam and power plant 400 miles northwest of bangkok thailand this job a 23,000 000 portion of the yankee power and irrigation project is being performed by a joint venture in which utah international is a 4.0 partner at the right is shown a comprehensive aerial view of a major portion of the 200,000,000 southern peru copper corporation installation constructed by our subsidiary cia utah pacific ltd this project situ ated in the andes mountains in peru encompassed construction of a completely integrated multi-plant copper mine mineral processing facilities and port work at ho peru also included were two town sites a railroad and highway between port and plant 4,5,000 kw power plant and water storage facilities the project was completed in 1959 eight months ahead of schedule |