OCR Text |
Show 43-16) U. S. Bureau of Yards and Docks - Construction Work in connection with Naval Air Station at Corpus Christi, Texas a) Their Contract No. - NOy-5954 b) Dated - February 25, 1943 c) Joint venture composed of: Columbia Construction Co, 22.225% Henry J. Kaiser Co. 7. 5 The Kaiser Co. 7. 5 J. F. Shea Co. Inc. 10.0 General Construction Co. 10.0 Pacific B ridge Company 10.0 MacDonald & Kahn, Inc. 15.0 Morris on-Knuds en Co. , Inc. 7.7775 W. A. Bechtel Co. 5.0 Utah Construction Co. 5.0 43-17) Pittsburgh Coal Company - Stripping Operations in Robinson Township, Washington County and Findlay Township, Allegheny County, known as Russell & Boggs - later as Imperial Stripping Operations a) Dated - July 1, 1943 b) Compensation Insurance with - Coal Operators Casualty Co. Policy No. B-I329 c) Completion time - Within 900 calendar days. 43-1 8) U. S. Army Corps of Engineers - Road Maintenance from Whitehorse, Yukon Territory to International Boundary with Alaska and from MP 108 southeasterly to Haines, Alaska a) Their Contract No. - W-3537-Eng-8 b) Compensation Insurance with - United Pacific Insurance Co. c) Completion time - October 31, 1944 d) Total amount - Cost - $3,400,000 Fixed Fee - $ 106,200 43-19) American Smelting & Refining Company - Excavation for Shifting Upper Track per Owner's drawing 111 76-B Trench excavation for laying 6" Pipe - Garfield, Utah a) Their Contract No. - Drawings 11176 B & 11205 B b) Compensation Insurance - Utah State Fund c) Total amount - $11,300 |