OCR Text |
Show B-7395 - 10/22/49 Revise sprinkler line 1st floor W-Bldg. $ 95.00 B-7391 - 10/24/49 Install Ferguson Case Packer 300.00 B-7392 - 10/24/49 Install canvas connections 105.00 B-7393 - 10/24/49 Revise base for rotary blower motor 65.00 B - 7394 - 10/24/49 Remote control cable system & lever for diverter gate 195.00 B-7586 - 11/7/49 Various installations & fabrications, see P.O. 3,093.28 B -75 85 - 11/7/49 Repairs to (Manifolds) (Crutcher) (Filling Mach. Boost. Fans) 736. 85 B-7698 - 11/7/49 Install port door, sampling door, tubing & manometer total: 111.00 B-7696 - 11/7/49 Install steel work bench, tower operating platform 78.00 3 - 7o99 - 11/8/49 Refise wiring (case packer) & addn'l. conduit line total: 104.08 B-7697 - 11/7/49 Install steel locker room under stairway W-Bldg. 200.00 B - 7656 - 11/7/49 Install hand-operat. classifier doors for sly collector 453.60 B-7752 - 11/15/49 Relocate dust ducts & product duct in storage bin 198.10 B-7760 - 11/15/49 Revise, install access ladders to roof of sly dust collector 4-9.35 B - 7788 - 11/18/49 Make 11 wire holders for wind indicators, etc., at tower 38. 00 B-7809 - 11/15/49 5" welded exhaust steam pipe line from W-Bldg. Basm't. to H-Bldg. 562.75 B - 7901 - 11/22/49 Run conduit & wire to pump on 4th floor, light, push buttons 348.12 B-7902 - 11/22/49 Install fire damper devices 42 . 00 B-7929 - 11/23/49 Switches & wiring fuel oil pumps in W-basmnt 48. 15 B-7965 - 11/28/49 Additions & repair work 74.76 B-8017 - 11/22/49 Work on furnace panel 73.50 B-8042 - 12/5/49 Starters & relays in motor control 2nd floor, W-Bldg 47.25 B-8237 - 12/17/49 Two temporary plywood office enclosures 244. 00 B-8238 - 12/17/49 Drip pans, rotary guards, fan shaft guards, belt guard, etc. 500.00 B-8239 - 12/17/49 Sheet metal covers for openings in wall of W -Bldg- 439.95 Revise ductwork to crutchers - 325.50 B-8240 - 12/17/49 Fifteen misc. items of repair & etc. - total price - 847.88 B- 8241 - 12/17/49 Revise & install 4 sly dust collector classifier doors 157.25 B-8242 - 12/17/49 Repair insulation syn. det. plant 450.47 B-3277 - 12/20/49 Revise No. 2 filling line 243.00 B-8278 - 12/20/49 Revise No. 3 filling line 243.00 B-8320 - 12/22/49 P.O. covering jobs done on time & material - total 1,716.28 B-7586 - 12/30/49 CHANGE ORDER - Cancel Item #1 - Relocation of chute - 80.00 B-8375 - 12/28/49 Electrical work in syn. detergent plant 407.50 B-8320 - 12/22/49 Change amount to add $2,360.44 - New total $4,076.92 |