Show EP-2827 - - Erection of facilities for Detergent Plant, Berkeley, Calif., commence 7/13/49, 90 W days $ 130,662 B-6118- 7/27/49 Furnish labor for steam line, Berkeley 19.50 B- 6217 - 8/2/49 Remodel hangers, relocate hot water tank, Berkeley 78.00 B-6252 - 8/4/49 Install two fuel oil pumps, Berkeley 189.29 B-6302 - 8/10/9 Install gas meters & manifolds boiler room 673.00 B-6409 - 8/15/49 install concrete pad; change pipe, pressure pump, orifice for elect. 80.00 B-6408 - 8/16/49 Install concrete pad; roof of Shy collector for gas tank 195.00 B- 6522 - 8/22/49 Office End., one window, one door 295.00 B-6501 - 8/24/49 Extend fire line in tunnel adjoining bldg. 178.86 B-6502 - 8/24/49 Run condensate in from pump in W basement to F basement 128.13 B-6594 - 8/29/49 Reweld all seams on schedule 10 stainless steel pipe 196.00 B-6658 - 8/29/49 Cut hole in floor for hot water pipe; concrete pad for strainer 45.00 Total B-6648 - 8/30/49 Two concrete piers to support product line 60.00 B-6409)- Supplement No. 1. Cancel Alteration to fire prot. & change pipe $25.00 (55.00) B - o639 - 9/1/49 Install 3" valve in fire ln from tunnel New Total to W-3 30.00 B-6705 - 9/6/49 Add'l. cost for chang insulat mat. on furnace to "Super X High Temp" 143.80 B-5752 - 9/12/49 N-Silicate storage & transfer system - $6,967.00 (Complete in 15 days). B-6803 - 9/14/49 Emergency lock type stop push-buttons & switches 507.15 B-6779 - 9/13/49 Cut two holes in building walls for pipe sleeves 70.00 3-1456 - 9/15/49 Elect. & Mechanical installations for Rotary Blower System 3,450.00 D- 1454 - 9/15/49 Elect. Installation of volume controller & outage detector 660.00 B-6869 - 9/15/49 Install & wire 5 starters & bushbuttons (Tower mtr control center) 196.35 B-6855 - 9/16/49 Revise ducon scrubber platform lighting 52.50 B-6907 - 9/20/49 Fabricate Section of 14 ga. ductwork 78.75 B-6870 - 9/20/49 Boxed sump in Ducon Scrubber Install syphon & piping - total 314.00 D-1455 - 9/22/49 Sly collector & connecting duct work (Ct-19) 11,950.00 B - 6937 - 9/22/49 Ins tall six transformers (damper control) change six colis 4th floor 60.90 B-6938 - 9/22/49 Relocate 3 conduits 4th floor 119.00 B-6937 - 9/22/49 Fabricate & install 16 ga, metal cover lagging duct 229.95 B-6981- 9/19/49 Columetric filling line Bldg, "W" (Giant Line No. 3) 772.00 B-6979 - 9/26/49 Revise dry material chute to clear product base line 210.00 |