1944 7

Title 1944
Creator Lubbers, Earl R.
Description This is a five volume set documenting the history of Utah Construction Company from 1900 to 1964. It is a yearly account of the projects completed, bids won, and bids lost. Many times this contains the only record of some small projects.
Subject Utah Construction Company--History; Construction contracts; Construction projects--Management
Digital Publisher Stewart Library, Weber State University, Ogden, Utah, USA
Date Original 1962; 1963; 1964
Date 1962; 1963; 1964
Date Digital 2009
Temporal Coverage 1860-1968
Item Size 8.5x11 inch
Medium Bound Book
Type Text
Conversion Specifications Archived TIFF images were scanned at 400 dpi with an Epson Expression 10000XL scanner and a Brother MFC-8860DN. JPG and PDF files were then created for general use.
Language eng
Relation https://archivesspace.weber.edu/repositories/3/resources/212
Rights Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University.
Source MS 100 Box 50 Special Collections, Stewart Library, Weber State University
OCR Text Show
Format application/pdf
ARK ark:/87278/s693y9bs
Setname wsu_ucc_erl
ID 42086
Reference URL https://digital.weber.edu/ark:/87278/s693y9bs

Page Metadata

Title 1944 7
Creator Lubbers, Earl R.
Image Captions 77 Pomeroy-Navy Expediting - (Contract awarded April 15, 1944} This Navy contract provided for the furnishing of engineering, expediting, liason, and administrative services in connection with supplying Government- owned lumber for use on Bureau of Yards & Docks Construction contracts on the West Coast. The contract, scheduled for completion in late 1944, involved a cost of services of $ 1,000,000 including the fixed fee. The co-venturers were: J. H. Pomeroy & Co., Inc. - 40% The Utah Construction Company - 40% Pomeroy Bros. Co. - 20% Completed Joint Ventures Mare Island Facilities Pacific Bridge Co. Coaster Vessels Pearl Harbor Drydock #4 Corpus Christi Naval Air Station COMPANY WORK Alaska Military Highway - wrap-up Public Roads Administration Contract U. S. Engineer's Contract Asheville Yard This repair shop and yard was created for reconditioning the equipment used on the Bryson job, and Watauga and Nantahala. Colorado Fuel & Iron - Cedar City The original contract was dated February 1, 1943, and was for mining, crushing and loading iron ore to the extent of 300,000 tons for $465, 560. To July 31, 1944, 267,482 tons of ore were produced. Duchesne Tunnel - Utah This job was closed down by B of R's order of December 26, 1942. On December 8 and 9, 1943, a conference was held with the government and it was determined the company should present a statement. This was done and contract was finally terminated in 1944. Friant Dam - Bureau of Reclamation This job was completed October, 1944. TVA - Bryson City, North Carolina This job was completed on May 16, 1944.
Description This is a five volume set documenting the history of Utah Construction Company from 1900 to 1964. It is a yearly account of the projects completed, bids won, and bids lost. Many times this contains the only record of some small projects.
Subject Utah Construction Company--History; Construction contracts; Construction projects--Management
Digital Publisher Stewart Library, Weber State University, Ogden, Utah, USA
Date Original 1962; 1963; 1964
Date 1962; 1963; 1964
Temporal Coverage 1860-1968
Item Size 8.5x11 inch
Medium Bound Book
Type Text
Relation https://archivesspace.weber.edu/repositories/3/resources/212
Rights Materials may be used for non-profit and educational purposes; please credit Special Collections Department, Stewart Library, Weber State University.
Source MS 100 Box 50 Special Collections, Stewart Library, Weber State University
OCR Text Show
Format application/pdf
Setname wsu_ucc_erl
ID 42135
Reference URL https://digital.weber.edu/ark:/87278/s693y9bs/42135