OCR Text |
Show 52-5 American Smelting & Refining Company, 600 Pacific National Life Bldg., Salt Lake City, Utah---Saft Station on Robert Emmet Shaft, and an approx. 350-ft. drift off Downtown Lateral at Leadville Drainage Tunnel, Leadville, Colorado._ a) Dated March 1, 1952 b) Compensation Insurance with Colorado State Fund c) Employer's Mutual d) Completion Time: May 1, 1952 e) Total Amount: $50,000. (Estimated) Fee $1,500.00 for Shaft Station - $10. per lineal ft. of advance in drifting. f) In Charge of Salt Lake District 52-6 Amsler Morton Corporation, Pittsburgh 19, Pennsylvania - - Labor, Equipment & Welding Rod to install structural steel piping supports at Geneva Steel Company, Geneva Plant. a) Dated December 17, 1951 b) Their No. 1445 c) Total Amount $14,969.00 d) In Charge of Salt Lake District 52-7 U. S. Corps of Engineers, U. S. Army, Kenai, Alaska---for Construction of Army Communications Station at Kenai, Alaska._ a) Their No. DA.-95-507-eng-305 b) Bond Amounts: Performance $3,236,000 and Pmt. $2,500,000 c) Premium Paid - $49,964.76 to Aetna (Pd. by J.H.Pomeroy & Co.) d) Completion Time: December 1, 1953 e) Total Amount $6,472,000.00 f) In Charge of J. H. Pomeroy & Co., Inc. (Sponsor) g) Joint Venture: J. H. Pomeroy & Co., Inc. 50%; Utah Construction Company 25%; and Bechtel Internation Corp. 25%. h) Amount of Contract Price: First $2,500,000.; Next $2,500,000. and Next $1,472,000.00 52-8 Utah-Beck, 418 Land Title Bldg., San Diego, California---Construction of Housing Facilities at Claremont, (San Diego), California. a) Joint Venture composed of Utah - 35%; Beck 35%; Hopking 5%; Burgener & Travis - 25% b) In Charge of Utah-Beck Office, San Diego 52-9 Johns-Manville Products Corporation, Pittsburg, California for Erection Equipment for Flexboard & Corrugated Transite at Building No. 1, Pittsburg, California a) Dated April 11, 1964 b) Their No. P-544 c) Total Amount #35,000. plus fee of $3,500 d) Richmond District Office in Change. |