Show 6 - Long Sault Powerplant in New York for the New York Power Authority in the amount of $35,850,000. Utah's share was 15%. 7 - Table Rock Powerhouse & Switchyard in Missouri for the U. S. Army Corps of Engineers in the amount of $6,200,000. Utah's share was 20%. 8 - Mulwala Power Station This was substation design for the Electricity Commission of New South Wales in the amount of $33,000. The Electricity Commission provided the basic single-line diagram, details of the major equipment to be used and site contour of each area. - From this information, the complete design of the substation was developed including all electrical, civil, and architectural work done by Utah specialist engineers. In addition to the above, a full specification together with schedules were prepared by Utah personnel to enable tenders to be called on a Schedule of Rates basis. 9 - Ilo Steam Station in Peru for the Southern Peru Copper Company in the amount of $3,500,000. 10 Toquepala Diesel Station in Peru for the Southern Peru Copper Company in the amount of $140,000. 11 - Carrum Outfall - Patterson River Channel The work was done for the State Rivers and Water Supply Commission at Patterson River, Carrum, Australia. Construction entailed widening and deepening the river and raising levee banks to prevent flooding. Using a dragline taking 6 cubic yards at each bite, over 800, 000 cubic yards of soils of various density were removed over a distance of 4 miles, and compacted into levees. The total amount of this project was $135,000. 12 - 5490 Tunnel Utah also claimed a world tunnel driving record on this project. On this rock tunnel job in Utah, the company excavated and lined 1, 363 ft. of 18 x 24 ft tunnel in 26 working days. Then for the next eight months they averaged 45-1/2 ft. per day in spite of unexpected rock formations. |